This project consisted of constructing a concrete foundation and slab for a large chemical tank structure. The project consisted of excavation, and pouring reinforced footings and slabs with embedded anchor bolts for mounting the new tanks. The main difficulty with this project was the extreme care needed to not damage any of the surrounding pipes and structures. All of our employees have OSHA 10 and HAZWOPPER 40 safety training.